Positions available / Position details

Job Offer Offshore Installation Engineer - Power Cable - Milan

Project Details

Installation of subsea power cable 

Current Project Phases

Installation / Operation

Role Definition

Responsibilities and specific technical competencies :  

  • Act as a technical interface with the client for document preparation 
  • Act as technical point of contact for scopes of work within the project  
  • Report to Installation Department outcome of meetings and technical discussions 
  • Critically evaluates technical and contractual information  
  • Analyses and understands customer technical challenges  
  • Development of technical design solutions against client scope of work.  
  • Fully grasps all engineering challenges and effectively utilizes engineering tools and techniques to overcome challenges as they occur.  
  • Develops technical procedures associated with installing cables in the offshore marine environment.  
  • Ensures that the engineering technical solution provision is best in class and effective with respect to cost, quality, and Safety. 
  • Good word processing skills     

Engineering including preparation of method statements for the following activities :    

  • Cable burial risk assessment (CBRA)  
  • Route Engineering,  
  • Burial assessment study (BAS)  
  • Survey works,  
  • Cable installation works, 
  • Pre-sweeping / dredging works,  
  • Mattress installation works,
  • Rock placement (rock dumping) 
  • Trenching works, 
  • Cable pull-in at landfall and at offshore substation    

Preparation of RAMS, ITP (inspection test plan), DPR (Daily Progress Report), HAZID, HAZOP, HSE and Quality documentation, construction drawing, calculation     

Qualification

  •  HNC/HND or equivalent in a technical Engineering subject  
  • An advantage to having a Bachelor’s or Master’s Degrees in Engineering Technology or other Engineering related subjects

Conditions

Ideally resident in Milan but due to COVID 19 situation is possible to work from smart working. 

Others informations

Start date : ASAP

Duration : long term assignement

Type of project : OffSHORE WIND Farm , Offshore Power Cable & optical fiber

Countries : Italy

Location : Milan